- Mercer Stainless - SS Tanks - 2009
3D Modelling & Workshop fabrication drawings.
- Brightwater Engineers - Rotating coating bowl - 2009
3D Modelling & Workshop fabrication drawings
- Brightwater Engineers - Plantation Energy WA Pellet Plant - 2009
3D Modelling & Workshop fabrication drawings
- Brightwater Engineers - Stockton Coal mine conveyor tensioners & Drums - 2008
3D Modelling & Workshop fabrication drawings
- WMC Engineering - Dual skin fuel tank - 2008
3D Modelling & Workshop fabrication drawings
- Taranaki Engineering - Todd Energy Aquatic Centre Hyrdoslide - 2008
3D Modelling & Workshop fabrication drawings
- Eastbridge Engineering - Greymouth Pool Hydroslide - 2008
3D Modelling & Workshop fabrication drawings
- Hebron Bridge main span beams - February 2008
3D Modelling & Workshop fabrication drawings.
- Cheese Slice Clamshell Packing Conveyor - Early 2008
3D Modelling/Design & Workshop fabrication drawings.
- Kupe Gas pressure vessels - Jan/Feb 2008
3D Modelling & Workshop fabrication drawings.
- Hamilton Waterworld Hydroslide - August 2007
3D Modelling & Workshop fabrication drawings.
- HP Fuel Gas Knockout Drum - November 2007
3D Modelling & Workshop fabrication drawings.
- Drain Pot pressure vessels - October 2007
3D Modelling & Workshop fabrication drawings.
- Cheese Block Debagger - 2004
3D Modelling/design & Workshop fabrication drawings.
- Cosmopolitan Club Structural Steel - 2004
3D Modelling & Workshop fabrication drawings.
- Pet food Production Line - 2003-2004
3D Modelling/design & Workshop fabrication drawings.
- Coalmine Service Shaft - 2003
3D Modelling & Workshop fabrication drawings.
- Calciner Fluidbed Cooler - 2002-2003
3D Modelling & Workshop fabrication drawings.
- Born Heater & Platform Steel - 2002
3D Modelling & Workshop fabrication drawings
- Building Extension- 2002
3D Model Structural Steel
- Dog Roll Handling System Redesign - 2002
Design and draw new roll handling system and produce 3D model.
- Hydrate Conveyor Fabrication Drawings - 2002
Workshop drawings for two 38m conveyors with centre Plough Units,
including Bin Chutes, Covers and Wash Down Trays.
- Powder 4# Air Heater Upgrade NZMP Whareroa Plant - 2002
Includes design and draw, equipment layouts, piping design and pipe
supports.
- Services Upgrade for Kiwi Dairies Stirling Plant - 2001
Includes design and draw, equipment layouts, piping design and pipe
supports.
- Water Treatment Plant Expansion Design & Build for Coca Cola Amatil
- 2000
Includes design and draw equipment layouts, piping design and pipe
supports.
- Water Treatment Plant Design & Build for Coca Cola Amatil - 2000
Includes design and draw equipment layouts, piping design and pipe
supports.
- P&ID spec update for Kiwi Dairies Whareroa (Approx 1200 dwgs)
2000-2001
- Cheese Packaging Plant Relocation - 1999
Includes design and draw equipment layouts, piping design and pipe
supports etc for total plant relocation.
We have also been involved in a number of small equipment
design and draw projects for FRC (Fonterra Research Center). These
include detail design from concept sketches to produce fabrication
drawings. |